History

Home Optimisation Maintenance What's New Contacts

Up

Application Software for:

bulletEarthmovers
bulletMiners
bulletContractors
bulletMaterials handling
bulletGovernment

 

 

 

 

History is the focal point for investigating performance and previous activities on plant, components and rotable items.

History is a sub set of information found in archived Work Orders and is generated when a work order is closed.

Alternatively, work can be entered without creating a work order, or when informal maintenance work is complete and next due dates are updated. This saves time, yet maintains a reasonable level of detail.

Only estimated costs are required, although true costs are transferred from work orders. You can enter non repair items i.e. insurance and registration payments. As long as estimates are within vicinity of true costs, management decisions remain accurate.

The History file is designed for flexible categorisation and searching. Sub modules contain details of work done by sub contractors, and the time remaining to the next overhaul of selected components.

Features:

bulletCombined scan/ full screen layouts making full value of screen real estate.
bulletUser definable categorisation of work types, including non repair expenses.
bulletSummary and detailed descriptions of work performed.
bulletOn screen linking to archived Work Orders.
bulletRange and locate selections by plant, component and sub component.
bulletAdhoc ranging for effective cross tabs.
bulletRotable History though multiple locations and plant units.
bulletMultiple contracts can be attached to History records, with links to purchasing (supply).
bulletSupplier file look ups with contacts, phone and fax numbers, product details etc.
bulletUser definable failure coding.
bulletDate and service meter unit tracking. History records can be displayed in either sequence.
bulletLocation identification to analyse effects of adverse conditions.
bulletString searches on any field appearing in an online screen.
bulletApproximate costs with real costs accumulated through the Work Order module.
bulletWarranty by Service Meter Units and date.
bulletHistory Gantt charts by date and SMU.
bulletAvailability and utilisation based on SMU's, Average Weekly Usage and Downtime.
bulletMeantime between repairs and failures.
bulletDowntime Analysis.
bulletUser definable downtime classifications, with multiple segments per History record.
bulletTotalling of all downtime for each History record.

Contract Jobs:

bulletRecords maintenance work done by external contractors, with links to supplier file for addresses, phone numbers, products and services and contact details.
bulletSegmentation of costs by labour, parts and other items.
bulletChoice of segmented or unsegmented jobs.
bulletComparison of actual to estimated costs.
bulletSegmentation of work performed, including amounts, and percentages complete.
bulletVariations recorded against work segments.
bulletProvision to include warranty clauses by expiry dates or service meter units.
bulletReferences to external documents or contract numbers.
bulletAbility to classify jobs by work type and link to a work order number.
bulletCrosstabs by component code.

Component Overhauls:

bulletMonitoring of components overhaul periods by SMU's and dates.
bulletDays and SMU remaining to next overhauls.
bulletPeriodic reporting for suggested overhaul work.
bulletStandard Reports.
bulletLost production time analysis.
bulletTop 10 reports by cost, downtime and lost production.
bulletFile preparation for import to spreadsheets for report presentation and graphing.
bulletAutomatic reporting functions scheduled by time and date.
bulletPersonnel involved including equipment operators and trade persons.
bulletBudget and actual comparisons (with or without the accounting interface).
bulletFailure analysis routines with statistical analyses.
 

 

 

 

Home ] Up ]

Send mail to support@gregsier.com.au with questions or comments about this web site.
Copyright © 1999 Greg Sier & Associates PL
Last modified: May 03, 2001